Resident

SIGN UP FOR RESIDENT INFORMATION AND UPDATES

Sign up for updates

* indicates required

IMPORTANT INFORMATION FOR RESIDENTS

All road closures are put in place with agreement from the local authority and Cheshire Police. The car parks will open on the Thursday to spread the ingress to site across three days. The closures are implemented to manage the ingress and egress of vehicles to the event site and to minimise disruption to locals by restricting non-residents from certain roads.

All local residents will be allowed to access the road on which they live at any time across the event weekend.

Across Thursday 22nd August & Tuesday 27th August, we plan to implement an extensive & robust External Crowd Safety, Security & Traffic Management Operation. The overall goal is to reduce and minimise any disruption within the local-areas and roadways surrounding the events site itself. Please expect and plan for increased vehicle & pedestrian movements throughout the Bank Holiday Weekend.

 

EVENT DETAILS:

Build phase: Friday 19th July Time: 08:00 until Wednesday 21st August, Time: 20:00

Live phase: Thursday 22nd August @ 8:00 until Monday 26th August @ 14:00

Break phase: Monday 26th August @ 14:00 until September 7th September @ 20:00

 
FOOTPATH CLOSURES

Warrington:

The following footpaths will be closed within the Warrington Borough Council area:

Hatton Footpath No.1 from its junction with Warrington Road to the Borough Boundary with Halton.; Walton Footpath No.3 from its junction with Chester Road to the Borough Boundary with Halton; Walton Footpath No.3A from Walton Footpath No.3 to the Borough Boundary with Halton.

The Order will be effective from Thursday 1st August for 5 weeks, as and when signed on site. Access will be under the control of the relevant Contractor for the duration of the restrictions. An alternative route will be signed and available on site where possible. The reason for the temporary restrictions is to facilitate construction works for the event.

Closures from 1st August:

·       Halton Footpath 1

·       Walton Footpath 3

·       Walton footpath 3A

 

Halton:

The following footpaths will be closed within the Halton Borough Council area:

  • Footpath D/1 from its junction with Daresbury Ln and its junction with footpath D/2
  • Footpath D/8 from its junction with Warrington Road to the Borough Boundary with Warrington
  • Footpath D/9 from its junction with Daresbury Ln to the Borough Boundary with Warrington
  • Footpath 304/3 from its junction with Warrington Road to the Borough Boundary with Halton

The Order will be effective from Thursday 25th August for 6 weeks, as and when signed on site. Access will be under the control of the relevant Contractor for the duration of the restrictions. An alternative route will be signed and available on site. The reason for the temporary restrictions is to facilitate construction works for the event.

 

ROAD CLOSURE INFORMATION:

Temporary Traffic Management Restrictions, Infrastructure, Signage, Marshals and Security Operatives will be deployed across key external locations throughout the full duration of the events Live Phase.

A temporary traffic regulation order (TTRO) will be in place from: Thursday 22nd August @ 05:00 until Tuesday 28th August @ 23:59 (with the potential to end this earlier if possible).

Please note the campsites open Thursday 22nd August @ 12:00.

·       This is to implement a restriction on pedestrians’ access onto the A56 for the duration of the event.

·       This is to minimise the number of pedestrians on the A56 during peak egress Saturday & Sunday night.

·       The order will run from Hollyhedge Farm to the Creamfields Production Entrance.

·       Pedestrians walking from the direction of Warrington will enter via the entrance facing Hollyhedge Farm.

·       Pedestrians walking from the direction of the Easter Expressway will access via the bridge installed near Hobb Lane.

 

ROAD CLOSURES:·

Daresbury Lane from its junction with Old Chester Road to its junction with Warrington Road.

·       Old Chester Road will be closed from its Northerly Junction with the A56 Chester Road to its junction with Walton Lea Road

·       Underbridge Lane is closed for its entire length.

·       Park Lane is closed from its junction with the A56 Chester Road to its junction with Warrington Road.

·       Holly Hedge Lane from its junction with the A56 Chester Road to its junction with Runcorn Road will be closed.

·       Hobb Lane from its junction with the A56 Chester Road to its Junction with Runcorn Road.

·       Chester road from its junction with the Park Lane.

·       Chester Road from its junction with Daresbury Lane to its junction with Delph Lane

·       Hatton lane at its junction with London Road

·       Warrington Road at its junction with Park Lane

·       Walton Lea Road Junction with Carlingford Road

·       Park Lane junction with Houghs Lane

·       Warrington Road junction with golf course entrance

·       Pillmoss Lane at its junction with Hatton Lane

 

ROAD CLOSURE TIMINGS:

Road closures, coning and VMS will be implemented from the following times:

  • Traffic management Infrastructure & Operative Rollout begins – Thursday 1st August

 

ONE WAY SYSTEMS:

Newton Lane Eastbound – Newton Lane will be made one way from Old Chester Road junction with Delph Lane to its junction with Summer Lane Thurs 22nd August @ 05:00 until Sun 25th August @ 05:00

·       Newton Lane Westbound – Newton Lane will be made one way from its junction with Summer Lane to the Delph Lane junction with the A56 Chester Rd Sun 25th Aug @ 5:00 until Monday 26th August @ 16:00

·       From Monday 5th August, there will be a build schedule deployment of signs and restrictions to support the increased traffic activity on the A56 Chester Road immediately around the Accreditation Hub and Blue Gate.

·       Daresbury Lane Closure – Thursday 22nd August @ 07:30 until Tuesday 27th August @ 23:59

·       All other Road Closures and Coning to be in place no later than – Thursday 22nd August @ 07:30

 

ROAD CLOSURES, CONING AND VMS WILL BE REMOVED OR REVERSED FROM THE FOLLOWING TIMES:

One way system – Newton Lane/Summer Lane – Sunday 25th of August @ 05:00

All closures and restrictions have been submitted to the local authority as official Temporary Traffic Regulation Orders and so must not be breached at any time. Please note, the entrance to the site on Daresbury Lane will be closed on Sunday 25th August.

 

ADDITIONAL INFORMATION:

·       VIP/Gold customers’ vehicles will be entering the event via the gated access behind the church – Daresbury village.

·       The field between Hollyhedge Farm and Hobb Lane is our coach and bus area (coaches and buses will exit onto Hobb Lane)

The Residents Liaison Manager, will be onsite from Sunday 18th August, and as with previous years our priority is reducing disruption to all residents and local stakeholders.

For questions or concerns about Noise
Please do not hesitate to get in touch with the Resident Communications Team, and we will do everything practical to address any concerns you may have.

 

EMAIL: residents@cream.co.uk  | RESIDENT LIASON CONTACT NUMBER: 0207 6888 900

Please note, to officially record any complaint, we respectfully request the following information:

·       Contacts First & Last Name

·       Your Property’s Unique What3Words Code

·       Your Property’s Full Name & Address including Postcode

·       Contact Number (Mobile or Landline)

·       Contact E-mail Address

 

How to find your unique What3Words Code:
Step 1: Download the free “What3Words” mobile app or visit www.what3words.com

Step 2: Select the tile on the grid that includes your property’s main entrance.

Step 3: Record/Note your unique 3-word code.

If you have any issues or information during the build and break, please contact us and we’ll contact you as soon as possible. This hotline will be operational from 8am till 8pm Monday 5th August through to Wednesday 21st August; the line will then be operational 24 hours from Thursday 22nd August until 8pm on Monday 26th. The line will reopen 8am till 8pm until Wednesday 28th August. The email address is monitored on a daily basis from now until 3 weeks after the event.

CONTACT

Any issues arising over the event weekend or leading up to the event you can reach out to the Resident liaison team.

The resident mailbox is monitored daily up until 3 weeks after the event

The Resident phone line will be operational during the following times:-

 

Monday 5th – Wednesday 21st August, 8am – 8pm

The line will be operational 24hrs from 8am on Thursday 22nd until 8pm on Monday 26th August

The line will reopen between 8am – 8pm on Tuesday 27th and Wednesday 28th August

 

Resident Liaison Email: residents@cream.co.uk

Resident Liaison Tel:  0207 688 8900

Please note, to officially record any complaint, we respectfully request the following information:

  • Contacts First & Last Name
  • Your Property’s Unique What3Words Code
  • Your Property’s Full Name & Address including Postcode
  • Contact Number (Mobile or Landline)
  • Contact E-mail Address 

How to find your unique What3Words Code:

Step 1: Download the free “What3Words” mobile app or visit www.what3words.com 

Step 2: Select the tile on the grid that includes your property’s main entrance.

Step 3: Record/Note your unique 3-word code.

 

SALVAGING @ CREAMFIELDS

If you wish to register your interest in joining Creamfields salvage this year, applications are now open on Eventree. Please note, you must create an account on Eventree to filling out your application, click HERE to apply

For any questions contact us at salvagers@cream.co.uk.